Barry Power Station Barry Power Station is a 230MWe gas-fired power station on Sully Moors Road in Sully in the Vale of Glamorgan, Wales. It is eight miles west of Cardiff and is next to a large Ineos Vinyls chemicals works that makes PVC and a Hexion Chemicals plant.
History Construction began in January 1997, and it was opened on September 7 1998, being owned by the AES Corporation, but trading as AES Barry Ltd. It was bought by Centrica on July 24 2003 for £39.7m. AES sold the plant because of the low price of electricity at that time.
Specification It is a CCGT-type power station. There is one 160MWe Siemens V94.2 gas turbine (built by Ansaldo Energia in Genoa and now called the SGT5-400F) that feeds exhaust gas at 544C to a heat recovery steam generator. Steam from this enters a 75MWe steam turbine running, like the gas turbine, at 3000rpm. Any excess steam is passed through an air-cooled condenser and returned to the system as de-aerated feedwater for the HRSG. It connects to the Western Power Distribution section of the National Grid via a substation at 132kV. The generator on the gas turbine is rated at 180MVA and has a terminal voltage of 15kV; the steam turbine's is 11kV.
Until 2000, it ran as a baseload station. The plant is 44% thermally efficient. The chimney is 60m high.
All copyrights acknowledged with thanks to Wikipedia. Another site by 3Cat Design 2006-2010 Whilst we try to give accurate information, we accept no liability for loss or incorrect information listed on this site or from material embedded on this site from external sources such as YouTube. If you do spot a mistake, please let us know. Email:[email protected]