Planned refurbishment work on the Castle Meadows footbridge over the River Gavenny has revealed serious structural failings leaving the bridge beyond economic repair.
As a result of the findings, and to protect public safety, the existing bridge will be removed as soon as possible. Some of the more secure supports may be re-used.
The timetable for building a replacement bridge is not yet clear as both funding and environmental consent will be required. However it is likely there will be a significant delay before it’s possible to replace the structure.
A diversion route (via Mill Street) will be signed shortly.
Monmouthshire County Council apologises for the inconvenience and will send out further updates as soon as possible.