Temporary road closure as new bridge is lifted into place

A new footbridge linking Litchard with Parc Derwen is set to be lifted into place on Sunday 25 April 2010.

This will mean that the Bridgend Northern Distributor Road between Heol West Plas Roundabout and the Litchard Hill Roundabout will be temporarily closed from 6am – 10pm to allow the work to be carried out.

During the closure, a diversion will be in place and signs will be erected to inform drivers.

,

Leave a Reply